Delper Integrated
A proposed 15-year, USD 96 trillion infrastructure and manufacturing programme, funded by bonds and run through one fiat-backed token.
- Total outflow
- USD 96.00T
- Investor cash ask
- USD 8.00M
- Implied post-money
- USD 20.00M
- Build horizon
- 15 years
- Bond coupon
- 9%
- Factories at full scale
- 560,000
What it is
Delper Integrated is the parent programme in the Delper Group Executive Summary. It brings four initiatives into a single economic engine. The proposal targets logistics friction, a global estimated at USD 800 billion a year in administrative drag, and industrial cyber exposure on legacy operational technology.
Who owns it
A consolidated holding company, Top-Co, would hold 100% downstream control. Radiant Synage would hold a 60% majority and contribute USD 12 million in IP, banking infrastructure and core lines. The investor would take 40%, as a significant minority.
What it builds
- Project Iron Nexus, USD 40T A multimodal transport grid linking deepwater ports, electrified rail corridors, express highways and air cargo hubs. Rail freight is designed to cut transport energy use by 60%.
- Project Make in India, USD 56T A coastal network of about 560,000 automated factories on one-acre sites, powered by 840 GW of dedicated nuclear baseload, along a 7,500 km corridor. The proposal projects a 28% share of world physical manufacturing value-add.
- Delper Aegis An enterprise industrial cybersecurity layer. Each production line sits behind an inline firewall targeting IEC 62443 Security Level 4, with a physical write-lock against remote programming. Projected base ARR is USD 247.7 billion at full scale.
- Delper Global Trust Infrastructure A buyer-first sourcing platform with two tracks. Track A (bulk) earns a 15.184% fee on gross merchandise value, settled on a 14-day cycle. Track B (retail) targets 24.2% gross profit per order, with escrow released after delivery and a satisfaction certificate.
Where the USD 96 trillion goes
The outflow is spread across eight asset layers over the build, at USD 6.40 trillion a year. Two layers take more than half of it between them.
Shares of the USD 96.00T total. Figures as stated in the source.
How it is funded and repaid
All of the USD 96 trillion is to be raised as bonds at 9%: USD 40 trillion for Iron Nexus and USD 56 trillion for Make in India. Both series are repaid from a shared net profit pool. Iron Nexus is targeted for retirement around Year 18 and Make in India around Year 20.
The immediate ask
The USD 8 million is split evenly between two tracks. Track A (global consultants setup) covers SAP process and ERP systems, SGS quality-control links, and a USD 2.6 million revolving escrow margin. Track B (India retail pilot) covers engineering, third-party quality control, legal and licensing, supplier vetting, cloud connectors, and a contingency. Track B is released in three tranches of USD 1.0M, 1.5M and 1.5M.
Points to test before relying on it
- The headline figures are very large. USD 96 trillion is comparable to the entire world economy, and the manufacturing share is a projection.
- Several partners and approvals are not yet in place: ONDC, SGS, the Axis Bank escrow, and regulatory clearance for the token.
- The USD 8 million covers only the first phase. Later phases depend on the bond market and the profit pool.
- The source has internal inconsistencies, including the FDE headcount.